CUSTOMER OBJECTIVES
- To conceptually define a future strategy for the treatment of waste water on the production site, taking into account the current condition of existing plants and new standards for the purification of waste water
OUR SERVICES/PROJECT SCOPE
- Analysis of the existing purification plant
- Determination of (statutory) requirements for waste water treatment
- Determination and evaluation of different solutions (partial renovation, new or partially construction) as well as appraisal of suitable technologies (anaerobic processes, waste water cooling, floating beds, etc.)
- Cost estimation of alternative solutions
- Evaluate the scenarios and determine the best-fit solutions
RESULTS
- Detailed report on the current plant status
- A future concept for the waste water plant, incorporating 16 tangible measures to reinforce and optimise the existing waste water treatment plant
- Operating costs reduced by approx. €400,000 per year
SPECIFICS